Explainer · 5:47
How Rackline works
One RFQ from paste to award, then the yard side: the RFQ inbox, connecting once, the cameras counting what came in, every deduction from what's left, the MetalTrax bridge, dead stock and the network rules — with the math drawn out. Each section shows a QR code that opens the same page on your phone. Every company, count and price in it comes from the demo network and is fictional.
Chapters · 5:47
Captions are in the player's CC menu. In the transcript below, every sentence is a timestamp: select one to play from there.
Transcript
Every heading and sentence is a timestamp: select one to play the film from there, or copy it to share that moment. Under each chapter are the pages that its QR codes open.
0:00One RFQ, many phone calls
- 0:00This film shows how Rackline works, with all the new features.
- 0:06A fabricator needs 6 lines of steel: 431 tons.
- 0:11A buyer calls one yard, and then the next yard.
- 0:15Each call has the same 3 questions.
- 0:17Do you have the steel?
- 0:19How old is the count?
- 0:20When can you ship it?
- 0:22By the last call, the first answer can be wrong.
- 0:25Rackline answers the 3 questions for all yards at the same time.
0:31Every rack as one standard item
- 0:31Rackline uses one idea.
- 0:34Each yard writes steel in a different way.
- 0:37Here are 5 names for the same tube.
- 0:40Rackline reads each name as one standard item, with a known weight per foot.
- 0:46Pieces, times feet, times pounds per foot, give the weight on the rack.
- 0:51Each listing also has a count, a place, and a time.
OpenCatalog
0:57Paste an RFQ, rank the yards
- 0:57To find steel, paste the RFQ as you received it.
- 1:02Rackline reads 6 lines: 862,000 pounds.
- 1:07Then Rackline ranks each yard that has the item, out of 100 points.
- 1:12Stock on hand gives 40.
- 1:14Distance gives 22.
- 1:17Freshness gives 16.
- 1:19Ship date gives 14.
- 1:21Price gives 8.
- 1:23Rackline hides a count that is older than 72 hours.
OpenPaste an RFQ
1:29Split, quote and award
- 1:29No single yard has 400 tons.
- 1:32So Rackline plans the split.
- 1:34Select fewest vendors, lowest landed cost, or fastest delivery.
- 1:40Here, 5 yards supply 79% from stock.
- 1:44One mill inquiry asks for the last 91 tons.
- 1:48Send one quote request.
- 1:50Each yard sees only its lines.
- 1:53The yard names stay hidden until each yard responds.
- 1:57Then award by line: 340 tons.
OpenSplit planner
2:02The yard side: RFQ inbox and assistant
- 2:02Now look at the yard side.
- 2:04The quote request arrives in the RFQ inbox.
- 2:08The yard sees only the lines that it can fill.
- 2:11A person counts the steel on the rack and confirms the quantities.
- 2:16Then the yard sends the quote, and both names unlock.
- 2:20The inventory assistant answers questions about the stock, from the yard's own ledger.
2:27Connect your yard one time
- 2:28A service center connects one time.
- 2:31Upload the inventory report from your ERP, or complete the catalog template.
- 2:36Each row becomes a standard item.
- 2:39If a description is not clear, the weight decides.
- 2:42Select who sees each product family.
- 2:45Set a daily sync, and publish.
- 2:48After 72 hours without a sync, Rackline hides your listings.
OpenConnect once
2:53What's left at a MetalTrax yard
- 2:54At a MetalTrax yard, the count starts at the dock.
- 2:57The tag on bundle 4 says 60 pieces.
- 3:01The camera counts 58, and the scale agrees.
- 3:05But the inventory does not change until a person confirms the count.
- 3:09What is left is arithmetic.
- 3:11590 on hand, minus 24 that the cameras did not find, minus 52 staged, equals 514.
- 3:21The network lists only this number.
OpenReceiving What's left
3:25Yard vision and the review queue
- 3:25Nine cameras watch the yard.
- 3:27They read the tags and count the bundle ends.
- 3:31Rackline accepts a tag read when its checksum is correct and MetalTrax expects that tag.
- 3:37All other readings go to a review queue.
- 3:40A person confirms each reading, corrects it, or rejects it.
OpenYard vision
3:46Every deduction from what's left
- 3:46What is left also removes other steel.
- 3:49A laser job cuts 40 base plates from one sheet.
- 3:53The remnant gets a new tag, and the skeleton goes to scrap.
- 3:57Damaged and defective steel is set aside.
- 4:00A back order reserves its pieces first.
- 4:03Rackline never promises this steel.
OpenWhat's left
4:07MetalTrax stays the record
- 4:07MetalTrax stays the system of record.
- 4:11The Rackline Bridge reads the MetalTrax exports every 15 minutes.
- 4:16Rackline never writes to the MetalTrax database.
- 4:20Instead, it makes a worksheet of MetalTrax transactions.
- 4:24A clerk keys each transaction, and the next export confirms it.
OpenMetalTrax bridge
4:31Dead stock, priced to move
- 4:31Some steel does not move for 9 months.
- 4:34Rackline lists it as dead stock, with a lower price that the yard sets.
- 4:40Rackline shows it to the buyers who searched for that item.
- 4:43When a buyer reserves a lot, the count at the yard decreases.
OpenDead stock
4:49Start from the catalog
- 4:49Buyers can also start from the catalog.
- 4:52It has 1,095 SKUs of tube, angle, channel, and plate.
- 4:58Plate is listed by the sheet.
- 5:00Each SKU shows which yards have it on the rack now.
- 5:05Select what you need, and send one quote request.
OpenCatalog
5:09The network rules
- 5:09The network operator sets the rules.
- 5:12Select when a seller's name unlocks: on response, on award, or at pickup.
- 5:18Select how old a count can be before Rackline hides the yard.
- 5:23Select when stock counts as dead.
- 5:25Six numbers show if the network is useful.
OpenNetwork & policy
5:29Every yard's rack, live