Skip to content
Rackline

Field app film · 4:43

Rackline Yard, the field app

One worker's shift on the phone app for the yard floor, with the ledger drawn out: install it from the time clock, find steel six ways, receive a bundle off its mill tag — 58 of 60, the ends counted in a photo — set a bent beam aside with a clip, count with no signal, and see every update land in one yard ledger and on the manager's feed. Each section shows a QR code that opens the same page on your phone. Every company, tag and number in it is the demo yard's and is fictional.

Chapters · 4:43

Captions are in the player's CC menu. In the transcript below, every sentence is a timestamp: select one to play from there.

Also on film: How Rackline worksOne RFQ from paste to award, then the yard side and the network rules · 5:47

Transcript

Every heading and sentence is a timestamp: select one to play the film from there, or copy it to share that moment. Under each chapter are the pages that its QR codes open.

  1. 0:00The floor and the office

    1. 0:00This film shows Rackline Yard: the field app for the people who move the steel.
    2. 0:06In a steel yard, the steel moves on the floor.
    3. 0:09The ledger stays in the office.
    4. 0:12A worker counts a bundle and writes the count on paper.
    5. 0:16Hours later, a person in the office types the count.
    6. 0:19Nobody in the office can see the bundle.
    7. 0:22Rackline Yard puts the yard ledger on the phone of each worker.
    8. 0:26Each update has a name and a time, and it can have a photo.

    OpenRackline Yard

  2. 0:32Install it from the time clock

    1. 0:32To start, open the field page in the yard console.
    2. 0:36Print its install code, and put the code at the time clock.
    3. 0:40A worker scans the code with the phone camera.
    4. 0:43Then the worker adds Rackline Yard to the home screen.
    5. 0:47No app store is necessary.
    6. 0:49On the first day, the worker enters a name and a crew.
    7. 0:53Each update then shows who made it.

    OpenField page and install code

  3. 0:57Find the steel, six ways

    1. 0:57Next, find the steel.
    2. 1:00Scan the yard tag on the bundle, or scan the mill tag.
    3. 1:04You can also type a heat number, a catalog SKU, or a size as people write it.
    4. 1:10Or pick the shape, the size, and the length.
    5. 1:14Each route gives the same result: one standard item.
    6. 1:18Scan a rack label, and the app shows each bundle that the ledger has in that bin.

    OpenSample tags Find

  4. 1:25What a mill tag says

    1. 1:25A mill tag has more data.
    2. 1:27The app reads the heat, the size, the grade, the length, the pieces, the weight, and the PO.
    3. 1:36It reads the codes that mills print, for example QR and Data Matrix.
    4. 1:41The bundle number on the tag matches the advance ship notice.
    5. 1:45So the app finds tag 40214, on the truck at Door 1.
    6. 1:51Then the app checks the weight.
    7. 1:5360 pieces, times 24 feet, times 5.59 pounds per foot, equals 8,050 pounds.
    8. 2:01The tag weight agrees within 1 percent.

    OpenMill tags

  5. 2:06Receive and count

    1. 2:06To receive the bundle, count the pieces.
    2. 2:09The count starts at the mill tag count: 60.
    3. 2:13This crew counts 58.
    4. 2:15The app shows 2 short, and the new weight: 7,781 pounds.
    5. 2:21For tube and pipe, the app can also count the ends in a photo.
    6. 2:25Add a photo of the bundle as proof.
    7. 2:28Then select Receive.
    8. 2:30The ledger records 58 pieces, 2 short of the 60 shipped.
    9. 2:35It puts the bundle away in Rack B, bay 9, level 2.

    OpenScan

  6. 2:41Photos, video, and setting steel aside

    1. 2:41Each update can carry proof: up to 12 photos and video clips.
    2. 2:46Here, a worker finds a bent beam.
    3. 2:49Select Set aside, then Damaged, then Bent.
    4. 2:54Record a short clip of the damage.
    5. 2:56Then select Set aside again.
    6. 2:59The bundle goes to the hold cage.
    7. 3:01What's left stops counting its 2 pieces until a lead releases them.

    OpenYard tags

  7. 3:07No signal: the outbox

    1. 3:07At the back of the yard, the signal is often weak.
    2. 3:11The app works without it.
    3. 3:13Save the update, and the phone keeps it in its outbox.
    4. 3:17When the phone has a signal again, the app sends the updates in order, oldest first.
    5. 3:22Each update has its own ID, so the ledger never applies it 2 times.
    6. 3:28The ledger uses the time of the save, not the time of the sync.
    7. 3:32If the steel changed before the sync, the ledger does not force the update.
    8. 3:37It holds the update for a lead, with the reason.

    OpenQueue

  8. 3:41One ledger, four readers

    1. 3:41Each update becomes an event in one yard ledger.
    2. 3:45The yard console, What's left, the MetalTrax worksheet, and the network listing all read that ledger.
    3. 3:52So one count on the floor changes each of them.
    4. 3:56A new lot from a mill tag gets the next field tag: 47001.
    5. 4:01The network then lists it as new stock.

    OpenWhat's left MetalTrax Network

  9. 4:06The manager's live feed

    1. 4:06The manager sees each update on the field page as it arrives.
    2. 4:10The feed shows who made it, when, and with which photos and clips.
    3. 4:15So a short count is visible before the truck leaves the dock.
    4. 4:19The page also keeps the install code for the next worker.

    OpenField page

  10. 4:24Hand the yard a phone

    1. 4:25Hand the yard a phone.
    2. 4:27Scan the code to open Rackline Yard.
    3. 4:29To try it now, print the sample tags, and scan them.

    OpenOpen Rackline Yard Sample tags